[QoL] Option to change order of runes in a weapon

Hi, thanks for the great game. And we are still at the beginning.

Current situation: Playing with xbox controller. Would like to change the order of some runes afterwards, so that I can have a rune on my prefered button. Especially for bows which have already 2 runes added.
Some customization for QoL would be nice.

Thanks a lot.

Best regards.

2 Likes

Good idea. :+1:
Also don’t have empty weapon slots selectable when cycling through weapons

1 Like

I think there could be a special UI showing and binding the available skills.

Re-Order Draft

Had some ideas. Hope its ok for Moon Studios to post a draft here.

Basic idea for a re-order process:

  • go to Eleanor shop
  • talk to her and select “Rune”
  • Select button A (on my xbox-controller). Re-order process begins
  • First Rune is selected on button X. By pressing down I can swap runes.
  • Pressing A again, will confirm my change

Before re-order:

  • on X: Twirl Dash
  • on Y: Cold Enchantment

After re-order:

  • on X: Cold Enchantment
  • on Y: Twirl Dash

What do you think?

Best regards.