Option to change order of runes in a weapon

Hi, thanks for the great game. And we are still at the beginning.

Current situation: Playing with xbox controller. Would like to change the order of some runes afterwards, so that I can have a rune on my prefered button. Especially for bows which have already 2 runes added.
Some customization for QoL would be nice.

Thanks a lot.

Best regards.

3 Likes

5 posts were merged into an existing topic: [Combined] Give us ability to move around Runes already installed

3 votes have been moved. A vote could not be moved because the user already voted in the other topic.